skip to Main Content

Manufacturing Processes & Production: 45 Hours

  • Identify customer needs
  • Determine resources available for the production process
  • Set up equipment for the production process
  • Set team production goals
  • Make job assignments
  • Coordinate work flow with team members and other work groups
  • Communicate production and material requirements and product specifications
  • Perform and monitor the process to make the product
  • Document and monitor the process to make the product
  • Document product and process compliance with customer requirements
  • Prepare final product for shipping or distribution

Maintenance Awareness: 45 Hours

OSHA 10 HOUR Objectives plus:

  • Perform preventive maintenance and routine repair
  • Monitor indicators to ensure correct operations
  • Perform all housekeeping to maintain production schedule
  • Recognize potential maintenance issues with basic production systems, including knowledge of when to inform maintenance personnel about problems with:
    • Electrical systems
    • Pneumatic systems
    • Hydraulic systems
    • Machine automation systems
    • Lubrication processes
    • Bearings and couplings
    • Belts and chain drives
Back To Top